CRR (Central Ring Road), Startup Facility No. 4
The Motorway 96.5 km long forming Startup Facility No. 4 will be a part of the construction of Central Ring Road A-113 (CRR).
According to the design documentation the start of SF (Startup Facility) No. 4 of Central Ring Road is provided at the intersection of CRR with M-7 Volga Motorway on Junction No. 1 and corresponds to 0 km. A part of transport Junction No. 1 is included in Startup Facility No. 3 of CRR, the other part of the Junction is included in SF (Startup Facility) No. 4 of CRR. The end of SF No. 4 of Central Ring Road is provided at the intersection with M-4 Don Motorway on Junction No. 7 and corresponds to 96 km. A part of transport Junction No. 7 is included in Startup Facility No. 1 of CRR (Central Ring Road), the other part of the Junction is included in SF No. 4 of CRR.
In respect of SF No. 4 of CRR design and estimate documentation has been developed, on which the Approvals of the FFA (Federal Autonomous Agency) Glavgosexpertiza of Russia (No. 1074-10/GGE-6683/04 dated November 08, 2010 and No. 1079-10/GGE-6683/10 dated November 08, 2010) have been obtained.
The financing of the construction is carried out at the expense of the federal budget subsides, funds of the National Welfare Fund of Russia and extra-budgetary sources of financing.
- Location:
- Noginsk, Pavlovo-Posad, Voskresensk and Ramenskoe Districts, Elektrostal and Domodedovo Urban Districts
- Length:
- 96,5 km
- Motorway Class:
- 1A
- Rated speed:
- 140 km/h
- The total construction cost under the Agreement (in prices of respective years, inclusive of VAT):
- 76,5 bln ₽
- State financing:
- up to 62%
- Contract type:
- Concession Agreement under the life cycle contract scheme (with the Concessor payment)
- Bid term:
- 30 years
- Bidding Period:
- 2014-2015
- Construction Dates:
- 2016-2018

Project graph all graphs
Project news
Project documents
Information Memorandum
- Information Memorandum (PDF , 1853 KB)
Project Financial Parameters
- Project Financial Parameters (PDF , 1134 KB)
Project Legal Parameters
- Project Legal Parameters (PDF , 717 KB)
Project Technical Parameters
- Project Technical Parameters (PDF , 1383 KB)
Project General Information
- Project General Information (PDF , 823 KB)